Installation
3-2
Part 1107600_03
2014 Nordson Corporation
Additional Information
This section presents installation procedures in their most commonly used
form. Procedural variations or special considerations are explained in the
additional information table that follows most procedures. Where applicable,
some table entries also contain cross‐reference information. Additional
information tables are indicated by the symbol shown to the left.
Installation Tasks
The installation sequence is as follows:
1. Verify that the required installation conditions and utilities exist.
2. Unpack and inspect the melter.
3. Mount the melter on the parent machine or support structure.
4. Configure the electrical service.
5. Connect hot melt hoses and guns.
6. Set up the melter to work with the manufacturing process.
7. (Optional) Install inputs and outputs.
8. (Optional) Adjust the motor for manual or gear‐to‐line operation.
9. Install optional equipment.
10. Flush the melter.
11. Adjust the pressure control valve.
12. (Optional) Set up melter‐to‐PC communication.
Experience of Installation Personnel
The instructions provided in this section are intended to be used by
personnel who have experience in the following subjects:
Hot melt application processes
Industrial power and control wiring
Industrial mechanical installation practices
Basic process control and instrumentation

Table of Contents

Related product manuals