Installation
3-45
Part 1107600_03
2014 Nordson Corporation
Installing Optional Equipment
Each item of optional equipment is shipped with instructions for installing and
operating the equipment. Refer to Section 7, Parts, for equipment part
numbers.
Flushing the Melter
WARNING! Risk of burns! New melters contain a small quantity of
low‐viscosity test fluid. Test fluid may splatter when discharged under high
pressure. Before flushing the melter, ensure that the pressure control valve is
set to low pressure.
Before using the melter for production, it should be flushed to remove any
residue left over from factory‐testing. Flushing the melter is accomplished by
processing a minimum of one tank volume of hot melt through the melter,
hoses, and guns.
Refer to Section 4, Operation, for information about filling the tank and
operating the melter.