Other Considerations
Consider the following additional factors when evaluating where to install the
melter.
The maximum distance between the melter and each applicator is
dictated by the power requirement of each hose. Refer to Appendix A,
Calculating Melter Power Requirements, for information about how to
determine the maximum allowable length.
The operator must be able to safely reach the control panel and
accurately monitor the control panel indicators.
The operator must be able to safely observe the level of hot melt inside
the tank.
The melter must be installed away from areas with strong drafts or where
sudden temperature changes occur.
The melter must be installed where it will be in conformance with the
ventilation requirements specified in the Safety Data Sheet for the hot
melt being used.
The melter should not be exposed to excessive vibration.