EasyManua.ls Logo

Nordson DuraBlue II - Unpacking the Melter; Moving the Unpacked Melter; Contents of the Installation Kit; Customer-Supplied Materials

Nordson DuraBlue II
206 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
3-6
Part 1126931_01
2018 Nordson Corporation
Unpacking the Melter
Before starting the installation, remove the melter from the pallet, locate the
installation kit, and inspect the melter for damaged and missing parts. Report
any problems to your Nordson representative.
Moving the Unpacked Melter
When moving the melter, always support the melter by placing any lifting
device under the chassis.
Contents of the Installation Kit
The installation kit contains a package of safety label overlays that are
printed in variety of languages. If required by local regulations, the
appropriate language overlay should be applied over the English version of
the same label. Refer to Safety Labels and Tags in Section 1, Safety, for the
location of each safety label.
Customer‐Supplied Materials
The following additional materials are also required to install the melter.
A power cable. Rigid or flexible electrical conduit will be required.
(Optional) Gear‐to‐line input signal wiring
(Optional) Input/output signal wiring

Table of Contents

Related product manuals