Installation
3-26
Part 1126931_01
2018 Nordson Corporation
Wire Inputs/Outputs to the Melter
See Figure 3‐6.
1. Route a 2‐, 4, 6, or 8‐conductor signal cable from the control equipment
to the melter and through the PG‐16 penetration on side of the base. Use
rigid or flexible conduit or a suitable strain relief to protect the cable from
the sharp edge of the conduit penetration.
NOTE: Use a signal cable suitable for NEC class1 remote control and
signaling circuits. To reduce the possibility of electrical shorting, route the
cable so that it does not touch nearby circuit boards.
2. Connect each pair of input and output wires to the appropriate terminals
on terminal block XI. Refer to Table 3‐6 for the terminal numbers that
correspond to each input.
Figure 3‐6 Location of the XI terminal block for connecting input/output wiring