Starting the Melter
Before starting the melter for the first time, confirm that the
melter is fully installed including any required inputs and outputs,
applicator drivers, pattern controllers, or timers.
melter's operating parameters are set up to support the
current manufacturing process.
Refer to Section 3, Installation, if any of the items listed above are
not complete.
To start the melter
1. Place the main power switch in the ON position.
2. Place the control switch in the ON position.
The melter:
Tests the control panel LEDs
Turns on the heaters (the heaters LED turns green)
Begins to automatically scan through and display the
actual temperature of the tank and each hose and applicator that has
a set‐point temperature that is greater than zero degrees. The
sequence of the automatic scan is: tank, each hose and
applicator pair, and then back to the tank.
Turns on the ready LED (green) when the tank and all of the
hoses and applicators are within 3 C (5 F) of their assigned