Preparation Checklists
Data Center Environment Considerations Yes No N/A Comment
Are the perforated floor tiles each rated at 400 CFM or
greater?
Do the data center air conditioners provide sufficient
front to back airflow?
Is airflow adequate to prevent hot spots?
Can the data center continuously satisfy environmental
requirements?
Can more vented floor tiles be obtained if required?
Related Information
■
“Environmental Requirements” on page 20
■
“Ventilation and Cooling” on page 21
Facility Power Checklist
Complete the following checklist to ensure that the facility power requirements are met for the
data center in which the server is installed.
TABLE 12
Facility Power Checklist
Facility Power Considerations Yes No N/A Comment
Do you know the required operating voltage and
electric current level of the server?
Are enough power outlets provided within 2 meters (6.5
feet) for each rack?
Do the power outlets have appropriate socket
receptacles?
Will optional ground cables be attached to the rack?
Are the circuit breakers for the equipment suitable in
terms of voltage and current-carrying capacities?
Does the power frequency meet the equipment
specifications?
Will system power be delivered from two separate
power grids?
Is there a UPS to power the equipment?
Do you have the minimum required power sources
to support the power load for the new hardware? Use
kilowatt (kW)/kilovolt (kVA) to express power load.
Site Planning Checklists 135