Preparation Checklists
Rackmount Considerations Yes No N/A Comment
Does the rack support installation of standard Oracle
PDUs?
If not, then complete this checklist.
Can the customer provide equivalent PDUs?
Can the customer provide a single PDU and its circuits
to support the power requirements in case a PDU fails?
Can the customer ensure power loads are evenly
distributed across all circuits of a single PDU?
Can the customer provide appropriate power drops for
the PDUs?
Related Information
■
“Space Requirements” on page 16
■
“Installing the Server Into a Rack” on page 37
Safety Checklist
Complete the following checklist to ensure that the safety requirements are met for the data
center in which the server will be installed.
TABLE 14
Safety Checklist
Safety Checklist Considerations Yes No N/A Comment
Is there an emergency power shut off?
Is there a fire protection system in the data center room?
Is the computer room adequately equipped to extinguish
a fire?
Is antistatic flooring installed?
Is the floor below the raised floor free of obstacles and
blockage?
Related Information
■
“Electrical Power Requirements” on page 18
■