EasyManua.ls Logo

Ormazabal ekor.rps - Commissioning

Ormazabal ekor.rps
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IG-150-EN version 04; 03/10/16
142
Reception, storage, installation and tests General instructions
ekor.rps
10.3. Unit addressing
See Communications conguration section.
10.4. Commissioning
The ekor.rps protections are received with the default
settings stipulated in the factory.
Before commissioning they must be set, by means of the
keyboard/display and/or PC, with the correct values for the
application, following the setting procedures.
The protection has been checked at the factory in order
to guarantee its accuracy in all of the setting points of the
dierent parameters. However, it is convenient to test some
points during reception and commissioning, in order to
ensure it is totally in proper operating condition.
Once the line is connected the real measurements the relay
is carrying out can be displayed, thus enabling you to check
for proper connection and operation.

Table of Contents

Related product manuals