EasyManua.ls Logo

Orved IDEA 40 - Vacuum Packing Foodstuff Using the Deaeration Cycle (Degas)

Default Icon
39 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
_______________________________________________________________________________________
ORVED S.P.A Rev.01 – 09/2019 – cod. 1500735-00EN – User Manual for
IDEA
vacuum packing machines
Pag. 44 a 76
9.4.3 Vacuum packing foodstuff using the deaeration cycle (Degas)
Vacuum cycle in several phases, which alternates vacuum and pause to allow the total air suction from the
inside part of the product.
Phase
Description Image
1a
Choose the bag depending on the use
(preservation or cooking) best suited to the
dimensions of the product: the product
should not take more than 2/3 of the bag
actual volume.
Insert products cooled to +3°C to achieve the
best result.
1b
Choose a container suitable for vacuum
packaging that fits in the vacuum chamber,
which remains at least 1 cm apart from the
packaging machine lid once closed.
Fill the container with foodstuff and close the
lid.
Filling limits:
• Solid products: 100%
• Broths, infusions: 1/2
• Vegetarian and meat sauces: 1/3
• Creams, cream-based sauces: 1/4
• Egg products or egg white: 1/6
Insert products cooled to +3°C to achieve
the best result.
2
Lift the lid to limit switch and clip the piston,
pulling it forward.
Description
1
Allows to enter the vacuum setting menu and step pause
_______________________________________________________________________________________
ORVED S.P.A Rev.01 – 09/2019 – cod. 1500735-00EN – User Manual for
IDEA
vacuum packing machines
Pag. 45 a 76
3
Make sure the vacuum chamber and
product to be packaged are dry.
Take care not to dirty or wet the inner part
near the bag opening.
Place the maximum number of black plates
(A) the vacuum chamber can contain,
according to the size of the product or the
container to be packed.
4a
Put the vacuum bag (C) containing the
product to be packed, in the vacuum
chamber (B) and place it centrally on the
sealing bar (D). The fringe has to overpass the
sealing bar about 2cm.
4b
Choose a container suitable for vacuum
packaging that fits in the vacuum chamber.
It is possible to remove the sealing bar, if
necessary.
Make sure that the air intake device be open.
5
Activate the command panel by double
quick touch on the screen.
Press the STAND-BY button, to turn the
machine on.
6
Select Degas Cycles
7
Press SETTINGS button or one of the icons to
edit the parameter of every step.
Press the correspondent icon to modify the
sealing time, if necessary.

Table of Contents

Related product manuals