EasyManua.ls Logo

OTARI MX-5050 - Section 5: Maintenance

OTARI MX-5050
146 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
May 1992
5 - 1
Section 5 Maintenance
The maintenance procedures described in this section should be performed
at regular intervals. Cleaning and demagnetizing the heads and tape path
should be performed before each recording session, and must be performed
before any electronic alignments are performed. Lubrication should be
performed after 1000 hours of operation or after 6 months, whichever comes
first.
This section includes the following sub sections.
5.1 Maintenance Scheduling
.......................................... 5-2
5.2 Demagnetizing
...................................................... 5-2
5.3 Cleaning the Tape Path
............................................. 5-3
5.4 Lubrication
.......................................................... 5-4

Table of Contents

Other manuals for OTARI MX-5050

Related product manuals