EasyManua.ls Logo

Pentair Fleck 5800 XTR - Page 82

Pentair Fleck 5800 XTR
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installer Manual Fleck 5800 - XTR - Programming
82 / 122 Ref. MKT-IM-006 / B - 16.01.2018
6.4.5.3 Time Based
start time #: Time the relay will turn ON from the start of a regeneration cycle.
end time #: Time the relay will turn OFF from the start of a regeneration cycle.
Press to save and to pass to the second time settings screen or to the master settings screen.
Press to return to the master settings screen without saving.
Set the second times and press to save and to pass to the second relay settings screen if present,
or press to return to the master settings screen without saving.
If already in second relay, or if second relay has not been activated, press to save and to return to
the master settings screen or press to return to the master settings screen without saving.
6.4.5.4 Volume Based
Aux. #: Time Based
start time 1
1 m
end time 1
5 m
Aux. #: Volume Based
15 s
550
L
volume
duration

Table of Contents

Other manuals for Pentair Fleck 5800 XTR

Related product manuals