3 Installation Instructions
32
5
Insert the probe covers into the base station. Up to two units of 16 probe covers each can be
stored within the base station.
6 Insert the thermometer into the base station until it clicks into place.
7 Insert the other end of the communication cable into the MIB/RS232 (1) port of the monitor.
8 Configure the MIB/R232 port at the fetal monitor to iTemp.
Switch to the Service Mode.
Select the
Main Setup SmartKey to open the Main Setup window and select Hardware from the
menu.
In the
Setup Hardware window select Interfaces.
In the
Setup Interfaces window select iTemp for the MIB/R232 port.
NOTE
When disconnecting the thermometer cable from the base station, DO NOT twist the connector. Pull
on the ring of the connector to disconnect the cable.