EasyManua.ls Logo

POLYtij S3i - Page 31

POLYtij S3i
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Edition: A03 September 6, 2018
31
Shift List:
Display’s the default and newly built shifts.
New: Building a new shift
Interval: According to the selected time interval, 24 hours a day is divided into the
corresponding number of shifts. For example, the time interval is set to 4H, the system automatically
generates 6 shifts (default A-F) and displays them in the left list.
Start Time: Time of first shift. For example, set the interval to 4H, the starting time is set
to 8:00, then the first shift A start time is 8:00, shift B start time is 12:00, shift C start time is 16:00,
and so on.
Setting: Select the time interval and the start time, clickSet, to generate the default
shifts automatically, and displays in the left list.
Add shift】:If user need to add another shift, user can input the shift name and the
time, click Add, the new shift will then be added to the list on the left side.
Shift content list: Show the current team all content; Maximum user can add is 48 shifts.
delete: If you need to delete any shift, select that one in the list, click Delete. If user
needs to delete all existing shifts, clickDelete All

Related product manuals