4. Walk the first stage drive belt onto the smaller first stage Step-up Pulley assembly and
InputDrive assembly pulleys and tension the belt to 140-150 lbs (63.5 - 68 kgs), see
First Stage Drive Belt Tension Adjustment.
5. Tension the Second Stage belt to specification, see "Specifications" on page110.
Contact Precor Customer Support at support@precor.com or 800.786.8404 with
any questions.
Page 140
6 Replacement Procedures
Generator/Brake Assembly Replacement