SmartStor NAS User Manual
To restart/shutdown the Subsystem:
1. Click AdminTool tab > Subsystem Information.
2. Click the Shutdown/Restart button.
3. In the Shutdown/Restart window, you can:
Click the Shutdown button to stop I/Os and shuts down the
subsystem. After subsystem shutdown, you must manually
switch off the power at both power supplies.
Click the Restart button to stop I/Os, shuts down and restarts
the subsystem.
Click the Power Off button to turn off the system power. After
power off, the power core has to be removed then plugged in
to get Redundant PSU working again.
You can clear the physical drive, logical drive, and controller statistics by
following the steps below:
1. Click the AdminTool tab > Subsystem Information. The list of system
information.
2. Click the Clear Statistics button.
3. When done, click the Confirm button.
3.5.2 Service
To start the service of the SmartStor:
1. Click the AdminTool tab > Service. The list of service displays.
2. Move your mouse over the service you want and click the Start button.
3. Click the Confirm button.
48

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Promise Technology SmartStor NS4700 and is the answer not in the manual?

Promise Technology SmartStor NS4700 Specifications

General IconGeneral
BrandPromise Technology
ModelSmartStor NS4700
CategoryNetwork Storage Server
LanguageEnglish

Related product manuals