EasyManua.ls Logo

PRÜFTECHNIK OPTALIGN smart RS5 BT - Results

PRÜFTECHNIK OPTALIGN smart RS5 BT
194 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
149
A minimum of three measurement positions are required to obtain results, but
it is recommended that a maximum number of measurement points be taken to
improve the quality of results.
7.5 Results
When measurement is complete, press w to view results.
Sign convention (for vertical machines)
POSITIVE GAP opens towards 0:00 or 3:00
POSITIVE OFFSET if the top coupling half is offset towards 0:00 or 3:00
Cycle through the coupling results and the flange correction positions using either
w, f or g.
H
Note
The ‘all-in-one’ results
screen shows the coupling
gap and offset values in the
0-6 and 3-9 directions for
short flex coupling and the
flange correction values.
H
Note
Vertical flanged machines

Table of Contents

Related product manuals