Tech Service Bulletin No. A172/A199 – 016
Page 4 of 17
•
Confirming Charge Grid Voltage
1.
Enter SP Mode Special Features, page 1
2.
Turn Process control OFF, by selecting RESET, under Auto Process Control Self Check as illustrated
below:
3.
Enter SP Mode Adjustment page 4 Setting for P-con OFF Mode. Note the original setting of BK under
the VG column, then set it to -400 volts as illustrated below:
NOTE:
Setting VG to a level other than -400, can cause an incorrect adjustment.
Continued…
CAUTION HIGH VOLTAGE
!
!!
!
Use caution when working in this area
Do not touch the meter, meter leads, or allow the leads to touch frame ground
####63 #02'(6
#&RS\#LQ#63 ########,QGH[
#######3,'
?0HQX!
6HOHFW#IXQ F WLRQ#RU#LWHP
#3$*(#4
?7!#63#6SHFLDO#)HDWXUH
$XWR#3URFHVV#&RQ WURO#VHOI#FKHFN
Select Reset
5HVHW
?4!#63#$GMXVWPHQW
6HWWLQJ#IRU#30FRQ#2))#0RGH
#####63#02'(6
&RS\#LQ#63 #######,QGH[
?0HQX!
6HOHFW#IXQFWLRQ#RU#LWHP
VG
VB
3$*(#7
Adjust BK to
- 400 volts
BK
Y
M
-400