EasyManua.ls Logo

Roche Cedex Bio System - Page 486

Roche Cedex Bio System
496 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roche Diagnostics
F-16 Operator’s Manual · Version 3.1
Index Cedex Bio System
lots
– adding, B–101
– defining, B–101
– defining for calibrators, B–150
– defining for controls, B–149
– handling, B–98
– list, A–103
– viewing definitions, B–98, B–99
– viewing details of used fluids, B–100
lower-case letters, A–75
M
main calibration, E–12, E–26
maintenance
–instrument, C–5
– ISE, E–39
–overview, C–5
– screen, A–107
maintenance actions
– Abs. air/water calibration, C–28
– Activate electrodes, E–45
– Clean housing, C–21
– Clean ISE tower automatically, E–50
– Clean ISE tower manually, E–51
– Clean probe manually, C–12
– Clean reagent disk, C–14
– Clean rotor and heating channel, C–10
– Clean rotor heating channel, C–32
– Clean water and waste, C–16
– Cleanup database, C–23
– colors of entries, B–19
– Condition ISE tubing, E–46
– Contact service representative, C–27
– Daily prepare actions, E–44
– Deproteinize probe, C–10
– Electrode service, E–49
– Initialize ISE reference sensor, E–47
– Initialize ISE unit, E–53
– intervals, C–7
– intervals for ISE, E–41
– performing, C–6
– performing during End Shift phase, B–85
– performing during Prepare phase, B–19
– Prime fluid system, C–11
– Prime ISE calibrator and reference, E–48
– Replace ISE pump tubing, E–54
– Replace ISE unit tubing, E–57
– Replace photometer lamp, C–24
– Replace water inlet filter, C–19
maintenance days, B–167
manual, how to use, 5
mapping, application codes, B–160
measurements, specifications, A–65
measuring modes, ISE, E–6
messages
– alarms, A–81, D–10
– list, D–10
– overview, A–80, D–5
– screen, A–80, D–5
mixing motor, A–49
mixing reagents, B–76
– during Prepare phase, B–29
mixing rules, B–171
– definitions, B–171
– deleting, B–172
– importing, B–115
– printing, B–171
monitor
– See, alarm monitor.
monitoring
– analysis process, B–44
– ISE status, E–24
N
navigation, through screens, A–72
O
obsolete calibration, A–28
online Help, using, 5, A–79
operation
–overview, B–7
– principles, A–19
–routine, B–3
– routine ISE, E–17
–safety, A–6
operators
– qualifications, A–9
–regular breaks, A–9
optical safety, A–6
order of processing, B–44, B–145
orders
– changing, B–42
– changing with sample on board, B–42
– checking for unfinished, B–80
– defining, B–38, B–39
– defining profiles, B–148
– deleting, B–93
– handling, A–31
– IDs, A–31
– introduction to handling, A–31
– list, A–95
– order of processing, B–44
– overview, A–31
– STAT, B–41
– workflow setup, B–37

Table of Contents

Related product manuals