EasyManuals Logo

Roche Cedex Bio System User Manual

Roche Cedex Bio System
496 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #416 background imageLoading...
Page #416 background image
Roche Diagnostics
E-26 Operatorโ€™s Manual ยท Version 3.1
13 ISE operation Cedex Bio System
Daily operation
Main calibration
The main calibration of the electrodes must be performed periodically. It also needs
to be performed after certain maintenance actions.
For the indirect method, the sodium (NA-I) and potassium (K-I) tests are calibrated
with a two-point calibration using ISE Solution 1 and 2.
The main calibration is typically performed during the Prepare phase and, if there
follows a second shift, at the end of a shift. It is integrated in the Daily Prepare
Actions maintenance action.
e
For details on performing the Daily Prepare Actions maintenance action, see Daily
prepare actions on page E-44.
For details on performing individual calibrations, see Process of performing calibrations on
page B-61.
Performing QC
ISE QC handling is integrated in the operation of the main instrument.
a To perform QC
e
Follow the instructions given in Performing QC on page B-68.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Roche Cedex Bio System and is the answer not in the manual?

Roche Cedex Bio System Specifications

General IconGeneral
BrandRoche
ModelCedex Bio System
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals