EasyManua.ls Logo

Roche Cedex Bio System - Wash Station; External Fluid Connectors

Roche Cedex Bio System
496 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roche Diagnostics
Operator’s Manual · Version 3.1 A-47
Cedex Bio System 3Hardware
Hardware overview
Wash station
The probe is washed after each pipetting. It is lowered in the wash station and then
cleaner is pumped through the probe to wash it in and outside. Next water is pumped
through the probe to flush away the cleaner.
The wash station is connected by tubing to the internal waste container.
External fluid connectors
The three external fluid containers must be properly connected before you switch on
the Cedex Bio instrument.
Figure A-13 Wash station
A Water connector
B Cleaner connector with protective sleeve
C Waste connector
Figure A-14 External fluid connectors
A B C

Table of Contents

Related product manuals