Putting the Meter into Operation • 2
41
2.2 Powering the meter on and off
1 Place the meter on a level, vibration-free surface, or
hold it in your hand so it is roughly horizontal.
2 Power the meter on by pressing the button.
3 To power the meter off after use, press the
button for approximately 1 second.
Checking the software version
After displaying the Roche logo, the meter briefly displays
the Init (for “initialization”) screen. Here you can check
which software version is currently running on your
meter. (The Init screen shown here is for illustration pur-
poses only. Version numbers on your meter may differ.)
You can also power on the meter directly by inserting a
test strip, connecting the power adapter, or by docking
it in the Handheld Base Unit.
Init
04.00.00
CoaguChek
®