Meter Setup • 3
83
QC (quality control) Lockout QC Lockout ensures that the optional quality control tests
are run on a regular basis. This is independent of the
operator, however. This option should be used if you
work without operator lists.
It is also possible to enable Operator Lockouts and QC
Lockouts in parallel. In addition to defining time intervals
or numbers, QC Lockout can also be used to specify that
a quality control test must be carried out when a new test
strip lot is used (New Code).
1 From the Main Menu, touch Setup to open the
meter settings.
2 From the Setup Menu, touch QC Settings.
3 From the QC Settings menu, touch Lockouts.
4 From the Lockouts menu, touch QC Lockout.
5 Select the triggers for a quality control test, based
on lot and/or time or number of strips.
QC Lockout is disabled by default. For routine confirma-
tion of system reliability it is recommended to enable
this feature.
The lockout triggers are set once and are valid for all
parameters. The events (time intervals, numbers) trig-
gering the lockouts are counted individually for each
parameter.
QC Settings
09:15 am
05/29/2015
Lockouts
Scan QC Material
QC Range
Setup Menu
09:15 am
05/29/2015
QC Settings
ID Setup
Diagnostics
Options
Screen
Main Menu
09:15 am
05/29/2015
Control Test
Review Results
Setup
Patient T
est
Lockouts
09:15 am
05/29/2015
Operator Lockout
QC Lockout
ST
AT Test Confi g.