EasyManua.ls Logo

Rohde & Schwarz ZVL series - Transmission Measurements

Rohde & Schwarz ZVL series
624 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
R&S
ZVL Getting Started
Transmission Measurements
Operating manual 1303.6538.62 - 05 49
6. Press Device Setup again and select a file format or Clipboard.
7. Close the dialog and press Print Screen aga
in to copy the diagram to
a file or an external application.
8. Open the Nwa-File menu and select Save NWA As...
9. In the Save As dialog opened, select a file location, format and name
and activate Save.
The active setup is stored to a file and can be reused in a later session.
Proceed as described in section Starting the Analyzer, Shutdown to shut down your
analyzer.
2.2 Transmission Measurements
A transmission measurement involves the same steps as a reflection measurement.
Note the following differences:
J The test setup for transmission measurements involves two DUT and analyzer
ports. You can connect the input of your DUT to port 1 of the analyzer, the output to
port 2. After a preset, the analyzer will measure the forward transmission S-
parameter S
21
.
J The analyzer provides special calibration types for transmission measurements.
Use the calibration wizard and select an appropriate type. A TOSM calibration will
correct the system errors for all transmission and reflection S-parameters.

Table of Contents

Related product manuals