EasyManua.ls Logo

Rotax 125 MAX DD2 evo - Installation ECU into the Battery Clamp Assy

Rotax 125 MAX DD2 evo
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BRP-Rotax
INSTALLATION MANUAL
INSTALLATION ECU INTO THE
BATTERY CLAMP ASSY.
Step
Procedure
1 Prepare rubber pad (consists of two
halves) (pos. 1) and the ECU (pos. 2)
for installation.
Figure 4.2
1
Rubber pad
2
ECU
Step
Procedure
2
Install the rubber pad (pos. 1) onto the
ECU.
TIP
Align at the triangular bottom of the ECU.
It fits only in one position to the rubber
pad.
Figure 4.3
1
Rubber pad
Step
Procedure
3 Insert the complete unit into the battery
clamp assy..
NOTE
If difficulties at insertion occur, the inside of the
battery clamp assy. can be easily bent inward
so that the distance increases slightly.
ATTENTION
Make sure that the connection cable has been
installed between the two pads.
The connection of the ECU is on the rear side
(against the driving direction).
Effectivity: 125 MAX DD2 evo
3
Page 3
Edition: September 01 2019

Table of Contents

Related product manuals