EasyManua.ls Logo

ROUSH 422011 - Equipment and Supplies Required; Glossary of Terms

ROUSH 422011
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2015-2017 5.0L Mustang
Phase 1/2 RHD ROUSHcharger Kit
1316-RHD-AA 12152016 6 800.59.ROUSH
EQUIPMENT AND SUPPLIES REQUIRED
1/4" and 3/8" Drive Ratchets with Extensions
Metric and Standard Socket Sets (short and deep recommended)
Metric and Standard Wrench Sets
3/8" Drive Torque Wrench (7-35 ft-lb range)
6" Scale, Tape Measure, or Other Measuring Device
Assembly Lubricant (White Lithium Grease or Petroleum Jelly)
• Electrical Tape
Sharp Knife or Razor Blade
Medium Strength Thread Locker – Loctite
®
242 (blue) or equivalent
T-20 Torx Bit Screwdriver or Socket
5/16" Drill Bits and Drill motor
Coolant (meeting Factory Ford speci cation for 2015 Mustang GT)
1/2" Drive Ratchet or Breaker Bar
Short Phillips-head Screwdriver
5/8" Fuel Line Removal Tool
Solder and Soldering Iron
Heat Gun or Small Torch for Heat Shrink Tubing
Tie Straps (Zip Ties)
Trim Pad Tool (for pushpin removal)
Fender Cover (2)
GLOSSARY OF TERMS
Air Charge Temperature (ACT) Sensor (From the factory, this function is integrated into the MAF sensor. With
this kit, a separate ACT sensor is installed into the intake manifold)
Electronic Throttle Control (ETC)
Mass Air Flow (MAF) Sensor
Powertrain Control Module (a.k.a. ECM, ECU, PCU, EEC)
Positive Crankcase Ventilation (PCV)
Throttle Position Sensor (TPS)
ROUSH Diagnostic Tool (RDT)
Vapor Management Valve, or Evaporative Emissions Canister Purge Valve (EECPV)
Breakout Point – A place in an electrical harness where the wiring for an individual component leaves (breaks
out of) the main harness to attach to an individual component.

Table of Contents