EasyManua.ls Logo

ROUSH 422011 - Connect Supercharger Bypass Reference Line; Connect Brake Aspirator Hose Assembly; K-Brace and Battery Shield Installation

ROUSH 422011
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2015-2017 5.0L Mustang Phase 1/2 RHD ROUSHcharger Kit
SECTION D – INSTALLATION
1316-RHD-AA 12152016 76 800.59.ROUSH
8. Connect the open end of the supercharger bypass
reference line (7R3V-9E498) to the  tting on the
clean air tube.
9. Connect the brake aspirator hose assembly (hose
3) to the  tting on the clean air tube.
K-BRACE AND BATTERY SHIELD
1. Insert the new HVAC/battery (1316-18A344)
closeout.
2. Reinstall the eight (8) M6 bolts and torque to
9 Nm.
3. Reinstall the battery tray, torque the three (3) M6
bolts to 10 Nm.

Table of Contents