2015-2017 5.0L Mustang Phase 1/2 RHD ROUSHcharger Kit
SECTION D – INSTALLATION
1316-RHD-AA 12152016 73 800.59.ROUSH
2. Reconnect the other end of the coolant hose to
the upper RH inlet of the radiator. Secure it with
the clamp.
3. Reinstall the factory degas bottle onto the fan
shroud and torque the bolts to 10 Nm.
4. Install the engine degas bottle hose on the rear
of the bottle and to the upper LH radiator. Secure
both ends of the hose with the clamps.
5. Transfer the hose clamp from the bottle end of
the factory degas hose to new 3/8" engine degas
hose (1315-8276). Install the hose clamp (62002)
onto the other end of the engine degas hose.
6. Install the 3/8" engine bottle degas hose from the
engine degas bottle to the tting by the driver side
cylinder head on the coolant outlet neck. Tighten
worm gear clamp torque to 3 Nm.
7. Install the other end of the hose to the engine
degas bottle as shown. Secure the constant
tension clamp.