EB 6493 EN 4-1
Shipment and on-site transport
4 Shipment and on-site trans-
port
The work described in this section is only to
be performed by personnel appropriately
qualied to carry out such tasks.
4.1 Accepting the delivered
goods
After receiving the shipment, proceed as fol-
lows:
1. Compare the shipment received with the
delivery note.
2. Check the shipment for transportation
damage. Report any damage to
SAMSON and the forwarding agent (re-
fer to delivery note).
4.2 Removing the packaging
from the compact controller
Do not remove the packaging until immedi-
ately before mounting and start-up.
1. Remove the packaging from the compact
controller.
2. Check scope of delivery (see Fig.4-1).
3. Dispose and recycle the packaging in ac-
cordance with the local regulations.
1x TROVIS6493 Compact Controller
including seal for .panel mounting (0430-
1495)
1x Document IP6493
(Important Product Information)
1x Accessory 1400-7411, consisting of
2x Mounting clamp for panel mounting
1x 10-pole screw terminal
1x 14-pole screw terminal
1x Adhesive label kit with units
Fig.4-1: Scope of delivery
4.3 Transporting the compact
controller
Transport instructions
− Protect the compact controller against ex-
ternal inuences (e.g. impact).
− Protect the compact controller against
moisture and dirt.
− Observe transport temperature depend-
ing on the permissible ambient tempera-
ture (see the 'Design and principle of op-
eration' section).
4.4 Storing the compact
controller
Risk of damage to the compact controller
due to improper storage.
Î Observe the storage instructions.
Î Avoid long storage times.
Î Contact SAMSON in case of different
storage conditions.
Note
NOTICE
!