2.6 Checklist for mechanical and electrical installation
NOTE
The circuit diagrams shown in this Chapter are also available in larger format in the sys‐
tem documentation..
2.6.1 Installing the enclosure
Table 3: Installing the enclosure
Enclosure Reference
Installation of sampling probe see "Installing the sampling probe", page 21
Installation of sample conditioning see "Fitting the sample conditioning", page 24
Installation of distribution unit see "Installing the distribution unit", page 27
Installation of analyzer see "Fitting the analyzer", page 34
Optional: Installation of MPR see enclosed “MPR Operating Instructions”
2.6.2 Laying and connecting the gas lines
Table 4: Connecting gas lines
1
Gas line Connection
2
Heated sample gas line: From sampling probe
to sample conditioning
Sampling probe: see chapter 2.7
Sample conditioning: see chapter 2.9.2
6
Sample gas line: From sample conditioning to
distribution unit
Sample conditioning: see chapter 2.9.2
Distribution unit: see chapter 2.10.2
ß
Sample gas line: From distribution unit to ana‐
lyzer
Distribution unit: see chapter 2.10.2
Analyzer: see chapter 2.11.2
â
Analyzer sample gas outlet Analyzer: see chapter 2.11.2
5
Instrument air feeding to sample conditioning Sample conditioning: see chapter 2.9.2
5
Test gas feeding to sample conditioning
(optional)
3
Instrument air feeding from sample condition‐
ing to sampling probe (optional)
Sample conditioning: see chapter 2.9.2
Sampling probe: see chapter 2.7
ã
Zero gas feeding to distribution unit Distribution unit: see chapter 2.10.2
ä
Sample conditioning condensate outlet Sample conditioning: see chapter 2.9.2
1
Numbering see "Installation overview", page 11
INSTALLATION 2
8017324/15A2/V6-0/2019-10 | SICK T E C H N I C A L I N F O R M A T I O N | MARSIC200
15
Subject to change without notice