&RPPLVVLRQLQJ
S7-300 Automation System, Hardware and Installation: CPU 31xC and CPU 31x
9-2 A5E00105492-03
5HFRPPHQGHGSURFHGXUH3DUW,+DUGZDUH
With its modular structure and many different upgrade options, the S7-300 can be
very large and extremely complex. It is therefore inappropriate to initially start up
an S7-300 with multiple racks and all inserted (installed) modules. Rather, we
recommend a step-by-step commissioning procedure.
We recommend the following initial commissioning procedure for an S7-300:
Table 9-1 Recommended commissioning procedure - part I: Hardware
7DVNV 5HPDUNV ,QIRUPDWLRQFDQEH
IRXQGLQ
an installation and wiring
check according to
checklist
- in the following Chapter
Disabling connections to
drive aggregates and
control elements
This prevents negative effects on your system as
a result of program errors.
7LS Redirecting output data from your outputs to
a data block, allows you to check the status of the
outputs at any time
-
Preparing the CPU Connecting the PG in the Chapter &RQQHFWLQJ
WKH3*
Commission the CU with inserted power supply
module and CPU.
First, switch on the expansion modules (EMs)
which are equipped with an auxiliary power
supply module and then switch on the power
supply module of the CD.
in Chapter ,QLWLDO3RZHU
2Q
Central unit (CU):
commission the CPU
and power supply, check
the LEDs
Check the LED displays on both modules. in Chapter 7HVWLQJ
)XQFWLRQV'LDJQRVWLFV
DQG)DXOW(OLPLQDWLRQ
Initialize the CPU and
check the LEDs
- in Chapter 5HVHWWLQJ&38
PHPRU\
CU:
commission all other
modules
Insert further modules into the CU and
commission them in succession.
Reference Manual
0RGXOH'DWD
Expansion module (EM):
Connecting
If required, interconnect the CU and the EMs:
Insert only one Send IM into the CU and the
matching receiver IM into the EM.
Chapter 0RXQWLQJ
EM:
Commissioning
Insert further modules into the EMs and
commission them in succession.
See above.

Table of Contents

Other manuals for Siemens CPU 313C

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens CPU 313C and is the answer not in the manual?

Siemens CPU 313C Specifications

General IconGeneral
MPI InterfaceYes
Number of digital inputs24
Number of digital outputs16
Number of analog inputs4
Number of analog outputs2
Supply voltage24 V DC
High-speed countersYes
Bit Operations Execution Time0.1 µs
Word Operations Execution Time0.2 µs
Power Consumption5 W
Dimensions (W x H x D)40 x 125 x 130 mm
Operating Temperature0 to 60 °C
Communication InterfacesMPI
Programming LanguagesLAD, FBD, STL
Product type designationCPU 313C
Weight490 g

Related product manuals