Commissioning and operation
5.1 Connection of gas lines
MicroSAM
72 Operating Instructions, 06/2012, C79000-G5376-C560-07
5.1 Connection of gas lines
Procedure
1. Remove the dummy plugs from the gas inlets and outlets "1" to "7" of the chromatograph.
2. Connect the exhaust and gas lines according to the piping diagram.
5.2 Activating the gas supply
Requirement
All gas lines are connected and leakproof.
Procedure
1. Turn the carrier gas up to a pressure of 600 to 700 kPa.
2. Turn the sample gas up to an absolute pressure of ≤ 160 kPa.
3. If applicable, turn the calibration gas up to an absolute pressure of ≤ 160 kPa.