EasyManua.ls Logo

Siemens SIMATIC S7 - Page 25

Siemens SIMATIC S7
336 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
2–23
IP244
C79000–B8576–C859–02
The bridge circuit is balanced in the factory to 0 C = 0 mV. When using a 3-core shielded
connecting cable with 3 x 1.5 mm
2
cross sectional area, the balancing error over 50 m of cable
is < 1.5 C.
Fig. 3.1.3/2 Connecting a resistance thermometer for reference junction temperature compensation
0 V
M+
Pt 100
-
+
-
+
Multiplexer
17
M-
35
U
ref
16
0 V, MĆbar
in cabinet
(reference potential)
IP 244
The cable from the Pt 100 to pin 16 must be connected and must not be grounded
(otherwise this results in a ground loop, falsifying results).

Table of Contents

Other manuals for Siemens SIMATIC S7

Related product manuals