Commissioning (hardware)
5
5.1 Overview
Requirements
The following requirements must be satisfied for the first commissioning of the
SIMOTION D410‑2:
Your system with SIMOTION D410‑2 has been installed and wired.
Your PG/PC is connected to the SIMOTION D410‑2 via the PROFIBUS DP, Ethernet, or
PROFINET (D410-2 DP/PN only) interface.
Commissioning steps
Commissioning the hardware involves the following steps:
1. Inserting the CompactFlash card (Page 80)
2. Checking the system (Page 82)
3. Switching on the power supply (Page 83).
Additional references
For information on installing/mounting and commissioning the SINAMICS S120 components,
refer to the
SINAMICS S120
Commissioning Manual.
SIMOTION D410-2
Commissioning and Hardware Installation Manual, 01/2015 79

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens SIMOTION D410-2 DP and is the answer not in the manual?

Siemens SIMOTION D410-2 DP Specifications

General IconGeneral
BrandSiemens
ModelSIMOTION D410-2 DP
CategoryController
LanguageEnglish

Related product manuals