EasyManua.ls Logo

Siemens SINAMICS GM150 - Preparations for use; Inspections when receiving the delivery

Siemens SINAMICS GM150
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparation
Ensure that access to the holes in the bottom of the cabinets is unobstructed. Remove the
guard covers.
To screw the transport units together, you will need the following mounting hardware:
Hexagon nuts ISO 4032-M8-8 A2L
Contact washers SN70093-8-FSt-mechZn-f
Threaded pin M8 x 15.5
Screw cabinets together
To screw the cabinets together, proceed as follows:
1. Align the cabinets.
2. Insert the threaded pins through the holes . Use the corner holes and then every 300 mm.
Figure 5-2 Screwing cabinets together
3. Attach the contact washers to the threaded pins.
4. Screw the cabinets together using the nuts with a torque of 32 Nm.
5.5 Connecting to the foundation
Preparatory steps
1. Ensure that access to the holes in the bottom of the cabinets is unobstructed.
Installation
5.5 Connecting to the foundation
SINAMICS GM150 6SL3810-2LN31-8AA2
Operating Instructions Rev.201910281332 EXAMPLE 73

Table of Contents

Other manuals for Siemens SINAMICS GM150

Related product manuals