MAINTENANCE
TB20J Plus Operation Manual 63
© Feb. 2023
Table 10-8 Inspection and Preventative Maintenance Schedule(Continued)
Items
Intervals
Before each
delivery
1
or
quarterly
2
Semiannually
3
Annually
4
Foot switch
1, 3, 10 1, 3, 10 1, 3, 10
Emergency stop button (turntable
and platform)
1, 3, 10 1, 3, 10 1, 3, 10
Limit switch and main power switch
1, 3, 10 1, 3, 10 1, 3, 10
Overload limit system
1, 3, 10 1, 3, 10 1, 3, 10
Tilt alarm device
1, 3, 10 1, 3, 10 1, 3, 10
Drive brake
1, 3, 10 1, 3, 10 1, 3, 10
Rotation brake
1, 3, 10 1, 3, 10 1, 3, 10
Other inspection items
Operation Manual in the manuals
storage box
10 10 10
All decals/labels are complete, clear
and secure
10 10 10
Annual inspection of the machine
expires
/ / 10
No unapproved changes or
additions
10 10 10
Contain all safety notices
10 10 10
General structural components and
welds
2 2 2
All fasteners, pins, protective guards
and covers
1, 2 1, 2 1, 2
Grade of lubricating grease and
lubricating oil
10 10 10
Functional test of all systems
10 10 10
Paint and appearance
5 5 5
Marked inspection date on the
machine frame
/ / 12
Notify Sinoboom of machine
ownership
/ / 12