Section 4 – Pre-operation
4.1 Operator’s Responsibility
It is the responsibility of the operator, prior to each
work shift, to perform the following:
1. Visual and Daily Maintenance Inspections
Designed to discover any damage of
components before the telehandler is put into
service.
Completed before the operator performs the
function tests.
WARNING
Failure to locate and repair damage, and discover
loose or missing parts may result in an unsafe
operating condition.
2. Function Tests
Designed to discover any malfunctions before
the telehandler is put into service.
IMPORTANT
The operator must understand and follow the
step-by-step instructions to test all telehandler
functions.
The operator should make a copy of the Operator’s
Checklist (see Section 4.4) and fill out the visual and
daily maintenance inspections and the function tests
sections while performing the items outlined in this
section.
IMPORTANT
If telehandler is damaged or any unauthorized
variation from factory-delivered condition is
discovered, telehandler must be tagged and
removed from service.
Repairs to the telehandler may only be made by
a qualified service technician. After repairs are
completed, the operator must perform visual and daily
maintenance inspections & function tests again.
Scheduled maintenance inspections shall only be
performed by a qualified service technician.