Step 2: Unpack Equipment
Your Slayer espresso machine will arrive in a lidded wooden crate, bolted to a pallet
at the base. Unpack with the following steps.
Parts and tools:
Phillips-head screwdriver
Socket wrench
Two (2) rubber feet (included)
Steam handles (included)
Procedure:
1. Use a phillips-head screwdriver to loosen and remove the screws
(approximately eight [8] screws) located along the lower edge of the crate,
two (2) at each corner.
2. Carefully lift the lid from the pallet.
3. Remove all banding and packing material from the machine.
4. The machine is attached to the pallet with two (2) bolts that are screwed into
two (2) of its four (4) legs, one on each side of the machine. Use a socket
wrench to loosen and remove the two (2) bolts from the underside of the
pallet.
5. Attach the included rubber feet to the bottom of the two (2) legs that were
bolted to the pallet.
6. Prepare surface by laying out one or more towels, which will rest under the
machine’s feet and allow for easy sliding into desired position.
7. Holding the machine by the lower part of the Xs, as shown below, employ
two (2) people to lift the machine up and onto the towels on the prepared
surface.
11
Lift here

Table of Contents

Other manuals for Slayer Single Group

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Slayer Single Group and is the answer not in the manual?

Slayer Single Group Specifications

General IconGeneral
Boiler TypeDual Boiler
Brew Temperature ControlPID
Groups1
Pre-infusionProgrammable
Voltage110V/220V
Water SourcePlumbed or Reservoir
Pump TypeRotary