Parts and tools:
•
Flat-head screwdriver
•
Allen key
Procedure:
1. Use a flat-head screwdriver to remove the lock screw from the top of the
brew actuator.
2. Tighten the locking nut with an allen key. Test tightness by moving the
actuator back and forth.
3. Adjust locking nut until desired tension is achieved.
4. Replace lock screw.
‣
For additional assistance with this procedure, refer to parts diagrams
on pages 58-74.
After Maintenance Procedures
After completing the 6-month maintenance procedure, make the following
preparations to resume normal machine operation.
1. Turn on water supply, either at the source or at the filtration system.
2. Move steam actuator to the “on” position.
3. Reconnect machine to power supply; tank will automatically begin to fill.
4. Filling is complete when the pump motor ceases to work and a “click” is
heard. When tank is full, turn on steam tank heating element.
5. The machine is heated when steam begins to flow from the steam wand; at
this point, move the actuator into the “off” position.
6. Lift to remove cup tray and check the inside of the machine for leaks or
collected water.
Every 12-18 Months
Before Maintenance Procedures
Before starting the 12-month maintenance procedure, make the following
preparations.
1. Turn off steam tank heating element. Read “Step 9: Turn On Heating
Elements” on page 15 for help completing this step.
2. Turn off machine by removing its power source.
‣
If power source is not easily accessible, you may skip this step and
continue to step 3.
3. Turn off water supply, either at the source or at the filtration system.
4. Pull steam actuator forward, into the “on” position, to drain steam.
5. Lift to remove cup tray assembly.
6. Use phillips-head screwdriver to loosen the four (4) screws on the front,
curved panel; remove panel.