EasyManua.ls Logo

Slayer Single Group - 6 Month Maintenance

Slayer Single Group
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Return the clean dispersion screw and screen to the grouphead.
CAUTION: failure to reinstall the dispersion screw and screen before
next use may cause the grouphead to clog with coffee particles. Do not
attempt to brew espresso before the dispersion screw and screen have
been correctly installed.
For additional assistance with this procedure, refer to parts diagrams
on pages 58-74.
Every 6 Months
Before Maintenance Procedure
Before starting the 6-month maintenance procedure, make the following
preparations.
1. Turn off steam tank heating element. Read “Step 9: Turn On Heating
Elements” on page 15 for help completing this step.
2. Turn off machine by removing its power source.
If power source is not easily accessible, you may skip this step and
continue to step 3.
3. Turn off water supply, either at the source or at the filtration system.
4. Pull steam actuator forward, into the “on” position, to drain steam.
5. Lift to remove cup tray assembly.
Draining Steam Tank
vimeo.com/20110440 (password: prebrewpressure)
As steam is produced and exits the wand, minerals in the water are left behind
build up inside the boiler. The steam tank needs to be drained periodically to
remove these excess minerals. For assistance with this procedure, refer to parts
diagrams on pages 58-74.
Parts and tools:
1/4” teflon or poly tubing
Wrench
Procedure:
1. Lift to remove cup tray assembly.
2. Watch video for instructions about removing Slayers side panels.
For additional assistance with this procedure, refer to parts diagrams
on pages 58-74.
Adjusting Brew Actuator Tension
vimeo.com/20216962 (password: prebrewpressure)
If the brew actuator becomes loose, tighten with the following steps.
46

Table of Contents

Other manuals for Slayer Single Group

Related product manuals