HYD 5/6/8/10/15/20KTL-3PH USER MANUAL
inverter operation (Master/Slave)
For inverters connected with
Link port to each other, you set
Parallel Control to “Enable”
One Inverter need to be set as
Master (Primary), all other
inverters need to be set to Slave
(Replica)
Set each inverter with an
individual parallel address. (It is
an independent number from
Modbus ID)
After changes, select “save” item
to save the settings
Resets the Bluetooth interface of
the inverter if the device is not
found by the Sofar View App
This function is used to correct
the direction and grid phase
assignment of the CTs directly
connected to the inverter. During
CT Calibration, the inverter must
be connected to a battery and
the grid.
It is recommended to turn off
the load during calibration.
If calibration fails, check if the
battery can be
charged/discharged correctly
The inverter can be switched on,
switched off, set to standby or
set to normal operating mode,
which can be useful for
installation or maintenance work
Default setting: disabled
In situations where the customer
only wants to support the local
loads or has a zero-export limit
across all three phases. When
used in conjunction with the