3.5.6 Analyzing during shutdown
If there is no possibility for connection, you need to improvise in order to pick up the bus signal at an
existing terminal block of the fieldbus coupler, the field distributor, segment protector or a field device.
For example, you can try a double assignment of bus terminals.
Shut down the system before you divide the bus.
Disconnect all bus stations from the power supply.