172
Appendix
Setting procedures for CT and direct-connected meter
How to set the parameters of CT and Meter 2
a. Select Menu>Setting>Advance Setting>Meter/CT Setting and enter the Meter/
CT Setting interface according to the setting path.
b. CT is set by default. Choose the supported CT type. You can check the
connection status in Meter/CT Check.
====Meter/CTSetting====
>Select
CT
====Meter/CTSetting====
>CT Type
100A
c. Enable the meter 2 selection and set the meter address and direction.
====Meter/CTSetting====
>Meter 2 Addr
1
====Meter/CTSetting====
>Meter 2 Direction
Positive
How to check the power detected by Meter 1 and Meter 2
a. Meter 1: Select Menu>System Status>Meter/CT and enter the Meter/CT interface
according to the setting path. This interface displays the information including
feed-in power of L1, L2 and L3 detected by the connected CT. Positive value with
Pfeedin means power fed into grid; negative value means power taken from grid.
====System Status====
EPS
>Meter/CT
=====Meter/CT=====
>Pfeedin A 0.0W
Pfeedin B 0.0W
Pfeedin C 0.0W
a. Meter 2: Select Menu>History Data>E_USERDEF and enter the E_USERDEF
interface according to the setting path. This interface displays the information
including the output electricity of the connected on-grid inverter today and the
total which is detected by Meter 2.
=====History Data=====
>E_USERDEF
Error Log
=====E_USERDEF=====
>Output Today
0.0kWh
=====E_USERDEF=====
>Output Total
0.0kWh