EasyManua.ls Logo

SolaX Power X3-Hybrid G4 Series - Page 69

SolaX Power X3-Hybrid G4 Series
182 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
61
Electrical Connection
Pin assignment of COM terminal
Table 8-8 Pin assignment of Meter/CT terminal
Pin Pin assignment Description
1 CT_R_1
For CT connection2 CT_S_1
3 CT_T_1
4 485A
For meter connection
5 485B
6 CT_R_1
For CT connection7 CT_S_1
8 CT_T_1
Meter wiring procedure
Step 1: Take out the network cable from the meter box, thread the network cable
through waterproof connector (part D) and strip off the 15 mm insulation of the
cable.
15 mm
Figure 8-38 Stripping the insulation

Table of Contents

Related product manuals