EasyManua.ls Logo

SolaX Power X3-Hybrid G4 Series - Page 70

SolaX Power X3-Hybrid G4 Series
182 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
62
Electrical Connection
Step 2: Insert the stripped section into the Pin 4 and Pin 5 of RJ45 terminal (from meter
box). Crimp it tightly with a crimping tool for RJ45. Pay attention to the pin order
of RJ45 terminals. Use a network cable tester to check if the cable has been
correctly and properly crimped before connecting to inverter.
1 2 3 4 5 6 7 8
1 8
4) Blue
5) White
Figure 8-39 Crimping the network cable
Step 3: Install the network cable of the crimped RJ45 terminal to Meter/CT terminal
according to the labeling.
1
2
Meter/CT
Click!
Figure 8-40 Connecting to inverter Meter/CT terminal
Step 4: Strip off the 10-15 mm insulation for the other end of the network cable and
install it to meter terminal 24 and 25.
EP S
Meter Inverter
24 485A Pin 4 485A
25 485B Pin 5 485B
Waterproof distribution box
Figure 8-41 Connecting to Meter

Table of Contents

Related product manuals