Preparation before Installation
Install the inverter at least 500 meters away from the coast and avoid sea breeze
directly hit.
Sea breeze
Inverter
0 m
500 m 1000 m
Figure 4-1 Recommended installation position
Sea breeze
Inverter
0 m 500 m 1000 m
Figure 4-2 Incorrect installation position
NOTICE!
For the installation of the whole system, please refer to the specific environment
requirement of each unit.
4.1.2 Installation Carrier Requirement
The installation carrier must be made of a non-flammable material, such as solid brick,
concrete, etc. and be capable of supporting the weight of the inverter and suitable of the
dimensions of the inverter
.
If the wall strength is not enough, (such as wooden wall, the
wall covered by thick layer of decoration) it must be strengthened additionally.
Fire resistant
Withstand three times
inverter's weight and be
suitable for installation
and dissipation (Refer to
"13 Technical Data")
Figure 4-3 Installation carrier requirement