Daily Maintenance – Quick Guide: Maintenance
Sysmex House, Garamonde Drive, Wymbush, Milton Keynes, MK8 8DF, United Kingdom · Phone +44 333 320 3460 · Fax +44 1908 267 901
academy.training@sysmex.co.uk· www.sysmex.co.uk
Daily Maintenance
Performing Shutdown 1
Before commencing Shutdown 1 confirm the following:
• Make sure that slide glass has been loaded. Replenish slide glass if not sufficiently loaded.
• Confirm an empty magazine is loaded in the manual magazine holder. Load an empty magazine
if it is not loaded.
• Make sure that there are sufficient reagents available.
• If SP-50 is on the XN track, place the analyser into ‘offline’ mode.
To perform Shutdown 1:
1. From the [Menu] select [Shutdown].