3
4
SOLENOID VALVE (LEVER LOCK)
DISASSEMBLY AND ASSEMBLY
4K6AX002SOLENOID VALVE (LEVER LOCK)
Check valve
1. Remove the plug (3) from body (13).
Plug: 21.0 NĀ·m (15.5 ft-lb.)
2. Remove the spring (2) and the plunger (1).
3. Remove the O-ring (23).
4. Remove the plugs (16) and O-rings (25).
Plug: 26.5 NĀ·m (19.5 ft-lb.)
Assembly
Forīassembly,īfollowītheīsameīprocedureīasīforīdisassem-
bly in the reverse order by referring to the construction dia-
gram.
Inspection and adjustment
Checking the parts
Parts Judgment criteria Treatment
Coil
ā¢ī Whenītheīsolenoidīisīburnedīorīshort-circuited,īorīhasīaīwireībreak
ā¢ī Wiringīshort-circuitīorīwireībreak
Replace
Replace
Body
ā¢ī Scratches,īrustīorīcorrosionīatītheīslidingīpartsīandītheīspool
ā¢ī Scratches,ī rustī orīcorrosionīofītheīsealī partī inīcontactīwithītheī O-
ring
ā¢ī Otherīdamageīconsideredītoīimpairīnormalīfunction
Replace
Replace
Replace
Spool
ā¢ī Scratchesī onītheī outerī circumference,īonī whichī theī īngernailsī getī
caught
ā¢ī Movementīisīnotīsmooth.
Replace
Repair or replace
Spring
ā¢ī Rust,īcorrosion,īdeformation,ībreakageīorīotherīnotableīdamage Replace
O-ring āā Replace