ELEMENT LINE: Service & Maintenance Manual - rev. 1.2
Page 3.3
3.4. INSTALLING THE MACHINE ALREADY ASSEMBLED
Figure 3.4-1
1. The machine is supplied on a wooden pallet,
wrapped in nylon bag and packed in a carton.
2. To move the machine, it is necessary to use a
pallet truck or fork lift truck.
Figure 3.4-2
3. Remove the carton, the nylon bag and the
fixing straps which secure the machine on
the pallet.
4. Use a trolley to position the machine in the
place of installation, lifting it from the
weight stack end as shown by the arrows in
the figure, and leaving the wooden slat in
place.