EasyManua.ls Logo

Telemark 880 - Page 40

Telemark 880
278 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
p
Model 880 DEPOSITION CONTROLLER
y
SECTION 2.XX
e page 39 of 275 ^
The Power Related RunTime Screen parameter Dependency List is:
(Crystal Quality Indicator Select) L/Q, Loop x, Qual xx Film Parameters
(Manual mode) Running Process + Pressing fixed front panel MANUAL key +
attached Pendent (or on 1
st
STATUS screen: , , zero CH x)
(process start) .PerformCarry out the following 2 key sequence up to 3 times.
Press the fixed front panel START key + 1 of 4 touch panel keys:
Break Wait, Next Layer, Restart Layer, Reset / Start Process
(see figure in end of section 2.7). Use the appropriate touch key for the
task at hand. If unsure, use Reset / Start Process key in all 3 sequences.
Please read and understand this manual before starting a live process.
.options
material selection (4-2 to 4-6).
substrate selection (4-2)
tooling factor (ch 4, 4-3)
<< fig. 10-9, equip list 10-10 >>
<< sensor inst. 11-3 >>

Table of Contents